Hazardous Waste Treatment Storage Disposal Facility

This state-of-the-art pre-processing and treated waste landfill facility is a critical
enabler for Gujarat’s industrial belts, combining scale, safety, and sustainability. With
advanced waste characterization, the facility identifies the most effective treatment
pathways using best-available technologies, supported by a secured landfill capacity of ~2.5 million metric tonnes.

Our Solutions

  • Integrated solutions - Forced evaporation capacity of 100KL/ day; integrated leachate treatment and solidification and stabilization capacity of 300MT/ day.
  • Operational Efficiency through process automation and advanced control PLC & SCADA systems. Using the most up-to-date processing technologies, Veolia ensures that the waste is treated and safely released to the landfill.
  • State of the art in-house laboratory for comprehensive and quick check analysis; monitoring waste characterization parameters.
  • Transparency through live tracking of activities, online stack monitoring, and weather monitoring station. GPS-enabled vehicles for reliable transportation of hazardous waste.
  • Storage Facility - Hazardous waste and toxic pollutants pose significant health and environmental risk. An intermediate storage facility has been built for waste collection during the monsoon.

INTEGRATED COMMON HAZARDOUS WASTE LANDFILL FACILITY

-LOW-CARBON RESOURCE-EFFICIENT SOLUTIONS

-ADVANCED PRE-PROCESSING AND TREATED WASTE MANAGEMENT

-DIGITALLY ENABLED COMPLIANT OPERATIONS